Sunday, February 13, 2005

My 15 minutes

You may or may not know that I was the subject of a Boston Globe article about a year ago, regarding the digital era of music, etc. The article had a sentence that started with something to the effect of "When he moves into his new loft in the former Charleston Chew factory in March..." That was SUPPOSED to have been March of 04. Now I'm not even hopeful for March of '05. I bring that up because my uncle brought it up today, and I had completely forgotten it said that, but I digress.

We did a site visit on Saturday. The flooring was almost all sanded, the bathroom tile was done, and there was even some lighting (albeit ugly fluorescent stuff) over the entry door. The kitchen however, was a different story, as the cabinets have been installed below the finished floor. This wouldn't be a terrible issue for most, but since the range is a slide-in model, it has to be level with the countertop. As it stands, it's about 1/2" over, because the finished floor is run through where the range is supposed to go. Time will tell how they fix this one, but it could mean a complete removal and re-installation of the kitchen cabinets, AGAIN.

Anyway, check out the current pictures. You can see that it's nearing completion, but we still have a long way to go.

Hope everyone had a nice weekend.

0 Comments:

Post a Comment

<< Home