Early update today. My dad called around 10ish this morning to report that the flooring contractors had started the floor installation. They were even using a LASERLINE to get it STRAIGHT! How about that! Actual integrity by a contractor! Now, we dont know if they were using the laserline correctly, but at least their hearts are in the right place.

Supposedly the whole floor will be done today, or at least laid down, as there is going to (again supposedly) be a team of 6 working on it. The following still has to be completed:

- Delivery of range and refrigerator
- Bringing gas line for range up through the floor
- Installation of range
- Templating of countertop for island and base cabinets
- Installation of remaining cabinets
- Fabrication of countertops
- Installation of countertops
- Installation of undercabinet lighting
- Installation of dishwasher, 2nd oven, and refrigerator
- Installation of sink, garbage disposal, drain and faucet
- Installation of bathroom fixtures
- Installation of hot water tank
- 3 coats of sanding and poly on the floor, 4 coats in the bathroom
- Finishing the deck, installing the patio, fence, and gate
- Fixing the crooked ductwork on the bedroom wall
- Fixing the crooked ductwork in the living room
- Closing in and connecting the fireplace
- Fixing the ceiling over the kitchen
- Filling the hole in the ceiling over the dining area

Needless to say, for all those that were thinking that there's about 2-3 weeks left before my closing, take a look at that list. Not only is there a lot to do, but there is SOOOO much they can still royally F up.

IT AIN'T HAPPENIN'