Tuesday, February 15, 2005

Just an update...

...Here was the list from last week, updated as to what has been finished.

- Delivery of range and refrigerator *DONE!*
- Bringing gas line for range up through the floor
- Installation of range
- Templating of countertop for island and base cabinets
- Installation of remaining cabinets
- Fabrication of countertops
- Installation of countertops
- Installation of undercabinet lighting
- Installation of dishwasher, 2nd oven, and refrigerator
- Installation of sink, garbage disposal, drain and faucet
- Installation of bathroom fixtures
- Installation of hot water tank
- 3 coats of sanding and poly on the floor, 4 coats in the bathroom
- Finishing the deck, installing the patio, fence, and gate
- Fixing the crooked ductwork on the bedroom wall
- Fixing the crooked ductwork in the living room
- Closing in and connecting the fireplace
- Fixing the ceiling over the kitchen
- Filling the hole in the ceiling over the dining area

How bout that! One whole line item in one week! At this rate the closing will be sometime in JULY